Sunday, May 28, 2023

Week 34

 Finished wiping down the shower. Asked Doc to re-caulk a small strip and re-glue a strip of baseboard in front of the shower. Well, it turned into a 3+ hour job that included taking the shower door off and really scrubbing all the pieces and then re-caulking all of it. It does look really nice, better than when I cleaned it. Need to finish up the toilet, the sink area, walls and floor. For the entry, just need to wipe down the walls, the light fixture, the ceiling fan and the front door. I will probably shampoo the carpet at the bottom of the stairs. Really need to finish by Wednesday.

No comments:

Post a Comment